High Voltage Test

High Voltage Roof Membrane Test

The holiday detector dry test, delivered independently

Hi-Volt Survey™ is our high voltage electronic integrity test for flat roof membranes.

Often referred to as a holiday detector test or a spark test, the high voltage dry test identifies breaches, pinholes and discontinuities in exposed membrane systems, carried out in dry conditions across suitable flat and low-pitched roofs.

Using calibrated holiday detection equipment, we sweep the exposed membrane surface to identify breaches, pinholes, punctures, discontinuities and installation defects, the small failures that a visual inspection can’t see but that will let water into the roof if left unfound.

We’re independent roof surveyors. We don’t carry out repairs, so our findings reflect the condition of your membrane and nothing else.

Dry Test or Wet Test?

Hi-Volt Survey™ is one of two electronic leak detection methods we provide:

Not sure which applies? We’ll recommend the right method before anything is booked.

How the holiday detector test works

The test passes a controlled high voltage across the membrane surface using a brush or broom electrode, with the roof deck (or a conductive layer beneath the membrane) earthed. Where the membrane is intact, no current flows. Where there’s a breach, even a pinhole, the circuit completes, the equipment signals the defect, and its position is marked and recorded.

Because the method is electrical rather than visual, it finds what the eye can’t. Defects measured in millimetres, hidden within laps, or sitting in details that look perfectly sound from above.

The test is carried out in dry conditions on a dry membrane, which is what makes it fast. Large exposed roof areas can be swept systematically without waiting for rainfall or wetting down the surface, so it’s well suited to programme-critical moments like handover.

Punctures

Dropped tools, foot traffic, follow-on trades and installation damage all leave holes in the membrane. Testing locates them precisely so the repair is a patch rather than a strip-up.

Open laps & failed welds

Seams are the most common failure point on a welded membrane. A lap that looks sound from above can still be unsealed along part of its length, and testing shows exactly which section.

Defects at penetrations

Vents, outlets, soil pipes, cable entries, plant fixings and support feet are checked individually. These details carry a disproportionate share of roof failures because each one is a hand-formed junction.

Damage from later works

Solar PV installation, plant replacement, safety line fitting and maintenance access all risk breaching a membrane after handover. Testing establishes whether they have.

“Surveyroof provided a visual condition survey of the hotel roof. The photographic report gave us a clear view of the roof’s condition and a solid basis for planning maintenance and budgets, with no repair sales pitch.”

Tower Hotel, London

“14 years of working with Darren and Surveyroof – They are a fantastic company to deal with. I recommend them without a doubt.”

— Robert Coe

“Surveyroof used thermal imaging and moisture mapping to trace a persistent leak across the roof. They located the moisture, saving us from stripping areas that were perfectly sound.”

ALDI, Scotland

“Surveyroof used thermal imaging and moisture mapping to trace a persistent leak across the roof. They located the moisture, saving us from stripping areas that were perfectly sound.”

Grosvenor Centre

“Ahead of a major solar installation at our Scottish RDC, Surveyroof provided a pre-installation solar survey that gave us real confidence in the roof making the whole handover process far smoother.”

ALDI, Scotland

“Surveyroof carried out electronic leak detection and a membrane condition survey at our Pilsworth store helping us target repairs and avoid disruption to trading.”

ASDA, Pilsworth, Bury