Aldi Roof Survey

Aldi Pre-Installation Roof Survey for Solar Panel Works

Aldi

Project Overview

Surveyroof was appointed by a major national solar installation company to carry out a comprehensive pre-installation roof survey at the ALDI RDC Scotland. The objective was clear. Before any solar works began, the client needed an independent, unbiased assessment of the existing waterproofing so that any defects could be repaired by the building owner, protecting the installer from liability and ensuring a safe and defect-free platform for the upcoming PV system.

The surveyed roof formed part of the large chilled distribution facility and consisted of a Sika single ply membrane system covering 11,728 m².

Why This Roof Survey Was Essential

Solar installations add weight, penetrations, and mechanical movement to a roof system. Identifying issues before installation prevents:

  • Water ingress beneath new solar infrastructure
  • Future claims or disputes over pre-existing defects
  • Costly post-installation access, shutdown, and panel removal
  • Reduced membrane lifespan due to trapped moisture or unnoticed punctures

This is why independent roof surveys like this are now becoming a standard part of solar deployment across the UK.

Outcome for the Client

The independent survey enabled:

  • Clear visibility of every defect affecting waterproofing integrity
  • Accurate repair instructions for the building owner
  • Zero liability exposure for the solar installer
  • Safe progression to PV installation planning
  • Confidence that the roof could support long-term renewable infrastructure

The final deliverable included a detailed Membrane Condition Survey report, photographic library, and site drawing for ALDI’s facilities team and the solar contractor.

Roof Survey Report