The Tower Hotel, London

Roof Surveys and testing roof areas of The Tower Hotel in London

Project Overview

Surveyroof was instructed to carry out Roof Membrane Condition Surveys and testing across the multiple roof areas of The Tower Hotel, London — a landmark riverside hotel adjacent to Tower Bridge and St Katharine Docks. The building presents a roof configuration typical of large hospitality assets of its era: multiple separate areas at differing levels, extensive plant installations, terraces and a complex arrangement of details, upstands and interfaces. The hotel’s facilities team required an independent assessment of waterproofing integrity across all roof areas, covering multiple roof membrane systems. As an operational hotel, the survey had to be delivered without disruption to guests or hotel operations.

Why This Survey Mattered

For an operational hotel, roof failure is not simply a repair cost. Water
ingress reaches guest bedrooms, public areas, lift shafts and plant rooms,
and every affected room is a room out of service. Identifying membrane
defects before they present internally prevents:

  • Guest disruption, room closures and reputational damage
  • Reactive repairs carried out under emergency conditions and at premium cost
  • Damage to interior finishes, electrical systems and plant
  • Progressive saturation of insulation and reduced membrane life

Outcome for the Client

The independent survey gave Tower Hotel:

  • A defect-by-defect record of waterproofing condition across every roof area 
  • Accurate repair instructions that could be issued directly to a roofing contractor
  • Evidence to support maintenance planning, budget approval, warranty discussion and dispute resolution
  • A documented condition baseline for future comparison

Deliverables comprised a full Membrane Condition Survey report, photographic library and marked-up site drawings. Surveyroof does not carry out roofing repairs. Our findings reflected the condition of the roof, nothing more.

Roof Survey Report